Power Sector Policy - Breakthrough Energy Transmission is Beautiful Bang Screw
Ha! He definitely likes Marlboro Reds, so should be okay there.
09.04.2025 13:39 β π 0 π 0 π¬ 0 π 0Damn, gonna have to update this and make a v2 lol
09.04.2025 12:48 β π 1 π 0 π¬ 0 π 0Haha same same
31.03.2025 16:12 β π 0 π 0 π¬ 0 π 0Page 16: www.blackrock.com/corporate/li...
31.03.2025 15:33 β π 0 π 0 π¬ 0 π 0I never thought I would see transmission permitting in the BlackRock annual letter but here we areβ¦
Thank you @dkthomp.bsky.social and @ezrakleinbot.bsky.social (bot) for shining a light on these issues. #energysky
Yeah, fair. And it varies by region. Point is thatβs what it should be and it should take a week.
23.03.2025 18:26 β π 1 π 0 π¬ 0 π 0Stay tuned for some announcements about my new role focused on this topic in next couple of weeks...
Of course happy to chat with folks that are interested!
It's great that Commissioner Rosner is drawing awareness to this issue, as it is vital for grid planning too.
Given recent advances, we now have the tools to fix this problem, but we do not have the current business and policy incentives to do so.
Link to his letter: www.ferc.gov/news-events/...
For the current process, cleaning data between models and a lack of connectivity between them leads to 6 month studies.
For fully integrated T&D, LA100 took 4 years of data collection/cleaning, model connecting, and 4 weeks of running NRELs supercomputer flat out. We need this to get to a weekβ¦
This week, FERC Commissioner Rosner sent a letter to RTOs/ISOs on interconnection automation. I don't think most #energysky folks understand how important this is.
Pic 1 is a rough chart of a current bulk interconnection study.
Pic 2 is NREL's LA100 study. I find visuals helpful so let me explain.
Ohhhh okay yeah sure of course
07.03.2025 01:21 β π 4 π 1 π¬ 1 π 0Our guy @jackandreasen.bsky.social is testifying at Senate EPW tomorrowβ¦ looking forward to all your takes.
12.02.2025 01:56 β π 4 π 0 π¬ 1 π 0Bipartisan support for geothermal is BACK for the 119th Congress! Thanks to Reps. Maloy (R-UT) and Lee (D-NV) and Sens. Cortez Masto and Murkowski for sponsoring the STEAM Act to extend permitting parity across oil, gas & geothermal. www.cortezmasto.senate.gov/news/press-r...
07.02.2025 00:13 β π 5 π 1 π¬ 2 π 0This DOE report came out in 2003β¦ www.energy.gov/oe/articles/...
05.02.2025 20:01 β π 9 π 0 π¬ 1 π 0If anyone gives you an answer to anything rn they are full of it. No one knows.
29.01.2025 12:55 β π 2 π 0 π¬ 0 π 0If youβre in DOE, stay in DOE.
29.01.2025 12:43 β π 41 π 6 π¬ 3 π 0Correct.
28.01.2025 02:38 β π 1 π 0 π¬ 0 π 0Incredible stuff, this account would fly over here.
26.01.2025 23:53 β π 14 π 1 π¬ 3 π 0Donβt get me wrong, big fan, pun intended. Great way to make least cost energy, not the best way to make dispatchable energy and capacity markets/RA need to land somewhere in the middle here in both directions.
25.01.2025 17:52 β π 1 π 0 π¬ 0 π 0Iβm not a huge fan of the current 8 hour capacity accreditation. Just like I donβt think PJMs ELCC for gas takes into account gas transmission interdependencies very well (despite being lowered).
Basically, I think we need more than just staked Li+, so Iβm curious on Jigarβs take.
Sure. This was pretty well forecasted too tho. Probably a mix of improvements and better planning. I still think more freak events and a lack of firm contracts leaves the system very exposed.
25.01.2025 02:07 β π 1 π 0 π¬ 0 π 0Why stop at stacking two Li+ batteries? Why not 12+ hours or more?
25.01.2025 02:05 β π 1 π 0 π¬ 1 π 0With 3% load growth I donβt understand what you wouldnt just build peakers and RE+storage rn.
Whats the spread on a firm/non gas contract?
Also does 70%+ ELCC for gas seem right cold weather EEA events? Doesnβt seem like delivery during emergencies is well factored in.
I got chu fam
24.01.2025 22:17 β π 1 π 0 π¬ 0 π 0go.bsky.app/6J1B7RK
24.01.2025 12:21 β π 7 π 2 π¬ 2 π 0My point is the problem is with the EEA construct. Saying it has zero value because of that doesnβt mean it has no value. NERC didnβt even start looking at Tx as a reliability asset until late 2023.