Comments (18:32:49) NEXT: loss maps at injection
lumi not needed
@lhcstatus2.ovh.bsky.social
Automated posts about the operation of the Large Hadron Collider
Comments (18:32:49) NEXT: loss maps at injection
lumi not needed
Comments (17:44:33) aperture measurements
09.11.2025 16:44 β π 0 π 0 π¬ 0 π 0Comments (09:02:03) Background test
09.11.2025 08:02 β π 0 π 0 π¬ 0 π 0Comments (08:24:40) Crystal channelling optimization, then
background test
Comments (07:31:19) Fill for background test
collisions expected by ~8:30
Comments (06:52:13) crystal collimation set up completed
Next: fill for background test
collisions expected by ~8:30
Comments (06:30:45) crystal collimation set up completed
Next: fill for background test
Comments (02:20:36) crystal collimation set up at top energy
09.11.2025 01:20 β π 0 π 0 π¬ 0 π 0Comments (23:42:25) crystal collimation set up at injection
08.11.2025 22:42 β π 0 π 0 π¬ 0 π 0Comments (22:31:05) will dump beams and reinject for crystal set up
at injection
Comments (21:54:00) Collimation set-up in collisions
Lumi needed from all IPs
Comments (19:39:05) Collision setting up
Lumi needed from all IPs
Comments (17:49:48) NEXT: Collimation setup at top energy and
collision set up
Spurious collimator temperature interlock
dumped beams
Comments (15:23:40) NEXT: Collimation setup at top energy and
collision set up
Comments (14:21:32) Collimation setup at injections with ions
08.11.2025 13:22 β π 0 π 0 π¬ 0 π 0Comments (12:45:14) Pb ions injection and capture
*** Ions in the machine ***
Comments (12:36:18) Pb ions injection and capture
08.11.2025 11:36 β π 0 π 0 π¬ 0 π 0Comments (11:00:23) Next: Pb ions injection and capture
08.11.2025 10:00 β π 0 π 1 π¬ 0 π 0Comments (07:35:07) Pb optics commissioning with protons
08.11.2025 06:35 β π 0 π 0 π¬ 0 π 0Comments (07:32:25) Pb commissioning with protons
08.11.2025 06:32 β π 0 π 0 π¬ 0 π 0Accelerator mode changed to: ION PHYSICS
08.11.2025 05:55 β π 0 π 0 π¬ 0 π 0Comments (06:18:18) MDs over
Preparing for Pb commissioning
Comments (06:16:46) MDs over
Preparing to Pb commissioning
Comments (23:34:40) MD15210
TCT BLM response factor
Comments (22:07:42) the successful come back of MD17323
(3 TeV cycle)
Comments (18:05:02) the come back of MD17323 (3 TeV cycle)
07.11.2025 17:05 β π 0 π 0 π¬ 0 π 0Comments (17:22:28) the come back of MD17323 (3 TeV cycle)
staying at flat top for 30 minutes
Comments (17:13:21) the come back of MD17323 (3 TeV cycle)
07.11.2025 16:13 β π 0 π 0 π¬ 0 π 0Comments (16:02:59) last checks: MD17223 (rf - white rabbit)
NEXT: the come back of MD17323 (3 TeV cycle)
Comments (10:18:00) MD17223 (rf - white rabbit)
07.11.2025 09:19 β π 0 π 0 π¬ 0 π 0