xfb Analytics's Avatar

xfb Analytics

@xfbsays.bsky.social

โšฝ๏ธFootball analytics experts.๐ŸŽ“Building data-driven IT solutions for measuring player performances. ๐Ÿƒโ€โ™‚๏ธ๐Ÿ’ชCreators of CUBE analysis system (500+ metrics)๐Ÿ’ป๐Ÿ“Š โžก๏ธ for performance analysts, scouts, journalists, and bloggers. https://cube.xfbanalytics.com/en

295 Followers  |  306 Following  |  158 Posts  |  Joined: 14.11.2024  |  2.1107

Latest posts by xfbsays.bsky.social on Bluesky

Post image

Juventus finalised the signing of Francisco Conceiรงรฃo from FC Porto after he spent last season on-loan with the Bianconeri. A two-way player, who is a great dribbler, who carries the ball constantly, creates a lot for his teammates and defensively is also a big net positive.

23.07.2025 14:09 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Preview
Proven by Numbers - Dominik Prpiฤ‡ Dominik Prpiฤ‡ is a young left-footed centre-back who was a key player for Hajduk Split but from now he can prove himself in the international stage.

Dominik Prpiฤ‡ just transferred from HNK Hajduk Split to FC Porto today. And we've just finished an article about him, so we had to update it at the last minute. ๐Ÿ˜…

Read this analysis by Zsolt Ellenbruch on our blog!
Congrats, Dominik!๐Ÿ‘๐Ÿ™Œ

xfbanalytics.com/blog/blog-po...

10.07.2025 16:14 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image Post image

His creativity through dribbling and passing are his main traits, it will be interesting to see how these skills translate to a team that isn't as possession-heavy as other top clubs. His attacking pizza chart is ๐Ÿ”ฅ

07.07.2025 07:46 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image Post image

He produced the highest Expected Threat among wingers in La Liga, which is a huge accomplishment considering the other wingers playing in the league.

07.07.2025 07:46 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

รlex Baena has moved to Atlรฉtico Madrid in a โ‚ฌ45 million + โ‚ฌ5 million transfer from Villarreal. The spanish playmaker was one of the most creative players in Europe last season, this is an interesting signing for Diego Simeone's side.

07.07.2025 07:46 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

Franco Mastantuono is playing for River Plate during the
@fifaclubworldcup.bsky.social, will play for Real Madrid from next season. His pizza chart, xT heatmap, his progressive passes and his carries show his versatility. A left-footed right-winger, who is great at carrying and passing the ball.

18.06.2025 08:04 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image Post image Post image Post image

Real Betis will play against Chelsea tonight in the UEFA Conference League final. These visuals show the shot locations, the Expected Threat, the typical passes into the penalty area, and the zonal locations of the ground challenges by the teams in the competition.
@xfbsays.bsky.social

28.05.2025 12:59 โ€” ๐Ÿ‘ 1    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image Post image

A special thank you to the Football Education Center for the opportunity to present Cube in front of scouts this Friday. Data-driven analysis is essential for scouts nowadays.
@matraimark.bsky.social guided the audience through the presentation of our product.

23.05.2025 13:11 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image

Kane has a great chance of adding more silverware in the future, with FC Bayern Mรผnchen retooling in the transfer market. If they are able to build out the attack even more (adding one more player next to Olise and Musiala), Kane he will have a good chance at the Champions League trophy as well.
End

14.05.2025 11:59 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image Post image

His shot map and expected threat heatmap show that he takes up good shot locations and that he creates threat centrally. Bayern's huge talent advantage helps every player, but Kane isn't showing anything, we've not seen from him prior at Tottenham Hotspur and the England National Team.

14.05.2025 11:59 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image Post image Post image

Kane's all around game has improved consistently throughout the years, which helped his adaptation to his new team. His progressive passes and passes into the box highlight the creative side of his game.

14.05.2025 11:59 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

He still contributes defensively to a respectable degree with ball recoveries and interceptions. His attacking and possession metrics are the ones that describe him the best, although.

14.05.2025 11:59 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

Harry Kane has won his first major trophy as a professional footballer, winning the 2024/25 Bundesliga title. The English striker has played a crucial part in the success, scoring (so far) 25 goals (being the top goalscorer in @bundesliga-en.bsky.social).
Thread by @xfbsays.bsky.social
๐Ÿงต

14.05.2025 11:59 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Preview
Proven by Numbers - Zubairu Ibrahim Zubairu Ibrahim is a lightning-fast talent who has already become a key player for FK Partizan Beograd. How far can the young Ghanaian go?

Zubairu Ibrahim is a lightning-fast talent who has already become a key player for FK Partizan Belgrade.โšก๏ธ๐Ÿƒ

How far can the young Ghanaian go?๐Ÿค”

Analysis on our blog by Zsolt Ellenbruch!โฌ‡๏ธ
xfbanalytics.com/blog/blog-po...

#football #footballanalysis

12.05.2025 15:19 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image Post image Post image Post image

Football Forum Hungary 2025!โšฝ๏ธ๐Ÿ—ฃ๏ธ

If you're here, come and visit us!

Don't miss the Football Analytics Hackathon's final, it will start at 4 PM.

#football #conference

29.04.2025 12:53 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image

๐Ÿ”Ž Weโ€™re excited to welcome Pavol Holescak, Head Scout at Slovan Bratislava, to the jury panel of the Football Analytics Hackathon 2025!

โšฝ Weโ€™re proud to have him onboard for this yearโ€™s Final!

๐Ÿ“ Catch it all live at Football Forum Hungary.

#football #analytics

25.04.2025 14:26 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image

๐Ÿ” Meet Samu Varga, Head of Analysis at รšjpest FC, and one of our esteemed jury members for the Football Analytics Hackathon 2025!

โšฝ Weโ€™re excited to have him on board to help evaluate the next generation of football data talent!

๐Ÿ“ Join us for the live Final at Football Forum Hungary.

#football

25.04.2025 14:25 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image

๐ŸŽ‰ Weโ€™re thrilled to introduce Bence Kocsis, Lead Data Analyst at MLSZ, as the Jury President of the Football Analytics Hackathon 2025!

๐Ÿง โšฝ Donโ€™t miss the excitementโ€”join us for the live Final at Football Forum Hungary!

#football #analytics

25.04.2025 14:24 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image

They also made it to the semi-final of the FA Cup. Forest have an unexpectedly great season, which has so much further potential. Champions League football and maybe a trophy can go a long way in establishing the club in the Premier League's upper half.
End.

22.04.2025 13:30 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image Post image

Left: Typical key passes
Right: Typical passes into the final third
They use long balls a lot to move the ball up the pitch, they don't use intricate passes and movements to keep the ball and create danger with it.

22.04.2025 13:30 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image Post image

They mainly create threat from the left-wing (xT, left). Opponents attack on both flanks (xT allowed, right), but their centre-back partnership (Murillo and Milenkoviฤ‡) have been dominating their own box.

22.04.2025 13:30 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

They need finishing overperformance to overcome the lack of consistent attacking threat. Wood is providing that this season, as his PSxG/xG rate and percentile show it.

22.04.2025 13:30 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image Post image Post image

The pizza charts show their way of defending, in-possession game and attacking style. They are a throwback team a bit, not pressing a lot, do not use central entries in the final third or the box, relying heavily on crosses towards Chris Wood.

22.04.2025 13:30 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

Nuno Espรญrito Santo has done a tremendous job at Nottingham Forest, has them on the cusp of European qualification. Champions League football can certainly change the direction of this club.
Thread on their league season๐Ÿงต

22.04.2025 13:30 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

โšฝ๏ธWeโ€™re happy to announce this 2-day Basic Scout Course by the Football Education Center in Budapest!

๐Ÿ’ปWeโ€™re proud that students will use our Cube football analysis system during the course.

You can apply on the website:
www.footballec.com/termek/scout...

16.04.2025 12:42 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image

With Salah staying, he will further cement his legacy at the club and in english football. The club know have clarity over his future, which will help this much-anticipated summer for the front office to put its plans into action.

11.04.2025 10:33 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Post image

His shot map is the usual Mo Salah shotmap. Danger zone and right half-space are the main areas where he is shooting from.

11.04.2025 10:33 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image Post image

His attacking numbers are amazing. At 32, he is still an amazing goal threat and playmaker as a passer. He isn't as good of a dribbler anymore than before. He is third in xT carry+pass among Premier League wingers.

11.04.2025 10:33 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

Arne Slot's tactics highlighted Salah's strengths and decreased his defensive responsibilites. It might sound obvious, but setting up your team in order to maximise your best player's abilites will never be a bad strategy.

11.04.2025 10:33 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Post image

Mohamed Salah has signed a new, 2-year contract with Liverpool FC. The Egyptian winger's future has finally been clarified.
His season through numbers and visualisations by @xfbsays.bsky.social

11.04.2025 10:33 โ€” ๐Ÿ‘ 2    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0

@xfbsays is following 20 prominent accounts