Okay, while I love this book conceptually, the writing style was a bit of a challenge for me. There is no comma shortage here.
I utterly adored this sapphic period piece by @clpolk.com 💜 it’s been a while since I was so lovingly transported into such a signature world. Absolutely worth the read.
This was such a wonderfully painful, disturbing, dystopian book. I wish I could read French purely to enjoy it in it’s original form.
These might be some of the best pickles I’ve had in my life.
The way that people 50+ use ChatGPT makes me realize why certain aspects of the world are the way they are.
morning mood
So we eat the robots, ask AI to swab us for strep, and pay our rent in nuts and bolts?
Instructions Unclear, have been booked for a grippy sock vacation. 😀
My high school bio teacher once said “allergies are just your body’s very reasonable reaction to plants trying to have sex with you” and I think about that every time I sneeze now.
That’s horrible, I am so sorry you’re dealing with this.
Maybe SS and email?
@support.bsky.team EEEEWWWW PLZ FIX
Usually this size is just for seed saving but I cubed it into fried rice and it was actually delicious?
I feel so validated rn
Moralizing the extents of someone’s self harm is a slippery slope, to say the least.
😭😭😭
Omg they look amazing!!!!!
At least my momma and sister are flying in to visit me 💜
I buried a parent, one uncle got diagnosed with pancreatic cancer, and the other relapsed. So things are super great rn
I am so tired of burying people this year
The phenotypic and genetic association between endometriosis and immunological diseases
pubmed.ncbi.nlm.nih.gov/40262193/
🧪
Wow, just 5 more to go for #twitch affiliate status. So today's post is one of my most watched clips... where @eesnutch.bsky.social #explodes because our friend tim was a little too excited to get inside in #NuclearNightmare
www.twitch.tv/solarlunix/c...
#smallstreamer #pngtuber #gaming
1000% and we love it
Foraged some Virginia Bluebells! I find them to be a little bitter so I blanch them, then make a sweet batter to dip them in and pan fry.
THIS MAKES IT SO HARD FOR REAL SERVICE ANIMALS
Omar Akkad’s writing has absolutely twisted the sorrow out of me like a wet rag. I have wept and paced and felt such commiseration with an author that feels as disturbed, sick, sad, frustrated as I do. Please visit your library to pick up a copy!