Halifax Transit's Avatar

Halifax Transit

@hfxtransit.bsky.social

Official account for Halifax Transit. Call 311 or email contactus@311.halifax.ca for customer service.

1,579 Followers  |  2 Following  |  224 Posts  |  Joined: 28.01.2025  |  2.0152

Latest posts by hfxtransit.bsky.social on Bluesky

Video thumbnail

Don't miss your chance! We want to hear your feedback on the next chapter of transit planning in the municipality to ensure our transit system evolves with the region's growth and the needs of our diverse communities.

Take the survey before it closes on Oct. 5:
engagehalifax.ca/core-service...

04.10.2025 14:48 β€” πŸ‘ 2    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A yellow arrow snakes its way between two white dots, making a shape similar to a backwards "s", on a solid blue background. Below the arrow shape is the word "detour" in white. Below that is the Halifax Transit logo.

A yellow arrow snakes its way between two white dots, making a shape similar to a backwards "s", on a solid blue background. Below the arrow shape is the word "detour" in white. Below that is the Halifax Transit logo.

Routes 1, 4, 8, 9A/B, and 10A/B/C will be on detour from 7 a.m. to 3 p.m. on Saturday, Oct. 4, 2025, due to construction. 6 stops in the area will be impacted.

More info: halifax.ca/htdisruptions#SpringGardenRd

03.10.2025 19:15 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A graphic is a Transit bus at a stop. The text reads "New Transit Plan, We want to hear from you! Core Service Plan 2025-27." The Halifax Transit logo in included.

A graphic is a Transit bus at a stop. The text reads "New Transit Plan, We want to hear from you! Core Service Plan 2025-27." The Halifax Transit logo in included.

Transit's Core Service Plan survey is closing on Oct. 5. Don't miss your opportunity to share your thoughts with us. Residents are invited to help shape the future of Halifax Transit by sharing feedback on a new transit plan. Review the proposed plan details and complete the survey brnw.ch/21wWi2a

02.10.2025 13:54 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

UPDATE: Thursday, Oct 2, 2025 Woodside Ferry Service will return to regular service at 07:22 at Woodside Ferry Terminal.

02.10.2025 10:08 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
Post image

Woodside Ferry service is running on a 30 min schedule until further notice, due to maintenance. Ferries will depart Woodside at xx:07 & xx:37. Ferries will depart Halifax at xx:22 & xx:52. Alderney Ferry service is not impacted at this time. Shuttles will be provided.

02.10.2025 09:55 β€” πŸ‘ 3    πŸ” 2    πŸ’¬ 0    πŸ“Œ 1
A cartoon drawing of a Halifax Transit bus with a destination sign that reads "Holiday Hours".

A cartoon drawing of a Halifax Transit bus with a destination sign that reads "Holiday Hours".

Halifax Transit buses and the Alderney Ferry will be operating on holiday schedules on Tuesday, Sept. 30, 2025. There will be no Woodside Ferry service.

All buses will pull over at 2:15 p.m. for a moment of silence.

Schedule Info: halifax.ca/transportation/halifax-transit/routes-schedules

30.09.2025 11:05 β€” πŸ‘ 4    πŸ” 2    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

Stop Windsor St Opposite London St (8572) will be closed from 8 a.m. to 4 p.m. on Saturday, Sept. 27, 2025, due to construction. Passengers on Routes 4 and 90 are directed to Stop Windsor St Before Cork St (8571).

More info: halifax.ca/htdisruptions#8572

26.09.2025 19:30 β€” πŸ‘ 2    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

Stop Cobequid Rd Before Hillside Ave (6442) will be closed from Wednesday, Sept. 24 to Wednesday, Oct. 8, 2025, due to construction. Passengers on Routes 82, 84, 88, and 182 are directed to Stop Cobequid Rd After Park Ave (6433).

More info: halifax.ca/htdisruptions#6442

23.09.2025 19:30 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

Stop Cobequid Rd After Hillside Ave (6435) will be closed from Wed., Sept. 24 to Wed., Oct. 8, 2025. Passengers on Route 82 are directed to Cobequid Terminal Bay 1 (6297). Passengers on Routes 84, 88, and 182 are directed to Cobequid Terminal Bay 2 (6299).

More info: halifax.ca/htdisruptions#6435

23.09.2025 19:30 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

UPDATE: Tuesday, Sep 23, 2025 Woodside Ferry Service has returned to regular service

23.09.2025 18:59 β€” πŸ‘ 2    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
Post image

Woodside Ferry service is running on a 30 min schedule until further notice, due to a maintenance issue. Ferries will depart Woodside at 15:37 & 16:07. Ferries will depart Water Street Terminal at 15:22 & 15:52. Alderney Ferry service is not impacted at this time. A shuttle will be provided.

23.09.2025 18:28 β€” πŸ‘ 3    πŸ” 2    πŸ’¬ 0    πŸ“Œ 0
A yellow arrow snakes its way between two white dots, making a shape similar to a backwards "s", on a solid blue background. Below the arrow shape is the word "detour" in white. Below that is the Halifax Transit logo.

A yellow arrow snakes its way between two white dots, making a shape similar to a backwards "s", on a solid blue background. Below the arrow shape is the word "detour" in white. Below that is the Halifax Transit logo.

Routes 53 and 72 will be on detour from Monday, Sept. 22 to Wednesday, Sept. 24, 2025, due to construction. 9 stops in the area will be impacted.

More info: halifax.ca/htdisruptions#PinecrestDr

22.09.2025 13:45 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

UPDATE: Sunday, Sep 21, 2025 Alderney Ferry Service has returned to regular service

21.09.2025 15:18 β€” πŸ‘ 2    πŸ” 1    πŸ’¬ 0    πŸ“Œ 1
Post image

Due to undisclosed issue, Alderney Ferry service is suspended until further notice. Shuttle provided at xx:00 and xx:30 from Alderney and xx:15 and xx:45 from Halifax

21.09.2025 15:11 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 3    πŸ“Œ 7
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

Stop Barrington St Before Duke St (6106) will be closed on Saturday, Sept. 20 and Sunday, Sept. 21. Routes 1, 7B, and 10A/B/C are directed to Barrington St After Duke St Bay 1 (6087). Route 9A/B is directed to Barrington St Before Cogswell St Bay 2 (2348).

More info: halifax.ca/htdisruptions#6106

19.09.2025 19:45 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A yellow arrow snakes its way between two white dots, making a shape similar to a backwards "s", on a solid blue background. Below the arrow shape is the word "detour" in white. Below that is the Halifax Transit logo.

A yellow arrow snakes its way between two white dots, making a shape similar to a backwards "s", on a solid blue background. Below the arrow shape is the word "detour" in white. Below that is the Halifax Transit logo.

Routes 1, 3, 5, 10A/B/C and 320 will be on detour from Friday, Sept. 19 at 7 p.m. to Monday, Sept. 22, 2025 at 5 a.m., due to the scheduled Macdonald Bridge closure. 2 stops in the area will be impacted.

More info: halifax.ca/htdisruptions#MacdonaldBridge

19.09.2025 18:30 β€” πŸ‘ 2    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
Video thumbnail

From Friday, Sept. 19, at 7 p.m. to Monday, Sept. 22, at 5 a.m., Bridge Terminal bus bays 9 to 16 will be closed, and all buses will service bays 1 to 8. The weekend construction will result in detours for Halifax Transit buses.

For full details, including maps, visit brnw.ch/21wVVrJ

19.09.2025 17:54 β€” πŸ‘ 2    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A map of the construction impacts at Bridge Terminal from Sept. 19 to Sept. 22. The affected area has been shaded in to indicate the closed bus bays.

A map of the construction impacts at Bridge Terminal from Sept. 19 to Sept. 22. The affected area has been shaded in to indicate the closed bus bays.

During this time, Routes 10B/C and 87 will not service Stop Victoria Rd After Nantucket Ave (8429) or Stop Thistle St After Victoria Rd (8389). Passengers are directed to the designated bus bays at Bridge Terminal for these routes.

(2/2)

19.09.2025 17:00 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A graphic with an exclamation mark in a yellow circle.

A graphic with an exclamation mark in a yellow circle.

Please be advised that from Friday, Sept. 19 at 7 p.m. to Monday, Sept. 22, 2025 at 5 a.m., Bridge Terminal bus bays 9 to 16 will be closed, and all buses will service bays 1 to 8.

More info: halifax.ca/htdisruption...

(1/2)

19.09.2025 17:00 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

Stop Crichton Ave After Lakeview Ave (6531) will be closed from 9 a.m. to 4 p.m. on Thursday, Sept. 18 and Friday, Sept. 19, 2025, due to construction. Passengers on Routes 54, 55, and 56 are directed to a temporary stop located near 180 Crichton Ave.

More info: halifax.ca/htdisruptions#6531

17.09.2025 19:35 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

Stop Crichton Ave After Oakdale Cr (6530) will be closed from 9 a.m. to 4 p.m. on Thursday, Sept. 18 and Friday, Sept. 19, 2025, due to construction. Passengers on Routes 54, 55, and 56 are directed to a temporary stop located near 180 Crichton Ave.

More info: halifax.ca/htdisruptions#6530

17.09.2025 19:30 β€” πŸ‘ 2    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
Video thumbnail

Halifax Transit is inviting residents to provide their feedback on the next chapter of transit planning in the municipality to ensure our transit system evolves with the region's growth and the needs of our diverse communities.

Take the survey:
www.shapeyourcityhalifax.ca/core-service...

17.09.2025 15:01 β€” πŸ‘ 2    πŸ” 1    πŸ’¬ 1    πŸ“Œ 0
A satellite image of the parking lot at Cobequid Terminal. Impacted parking spaces are shaded in red.

A satellite image of the parking lot at Cobequid Terminal. Impacted parking spaces are shaded in red.

Please be advised that part of the parking lot at Cobequid Terminal will be closed on Wednesday, Sept 17, 2025. Parking will still be available in the remainder of the
lot. We thank you for your understanding.

More info: halifax.ca/htdisruptions#CobequidTerminal

16.09.2025 18:30 β€” πŸ‘ 2    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

From Tuesday, Sept. 16, until Tuesday, Sept. 30, 2025, Stop Lacewood Dr Before Willett St (7082) will be closed due to construction. Passengers on Routes 2, 3, 4, 30B, 135, 136, 137, 138, and 433 are directed to Stop Lacewood Dr Before Dunbrack St (7078).

More info: halifax.ca/htdisruptions#7082

16.09.2025 15:04 β€” πŸ‘ 1    πŸ” 1    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

From Tuesday, Sept. 16, until Tuesday, Sept. 30, 2025, Stop Southgate Dr Before McQuillan Ln (2358) will be closed due to construction. Passengers on Routes 91 and 192 are directed to a temporary stop located near 120 Southgate Dr.

More info: halifax.ca/htdisruptions#2358

16.09.2025 13:05 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

From Tuesday, Sept. 16, until Tuesday, Sept. 30, 2025, Stop Willett St After Chadwick Pl (8488) will be closed. Passengers on Routes 2, 136, 137, and 138 are directed to a temporary stop located near 1 Sheradon Pl.

More info: halifax.ca/htdisruptions#8488

16.09.2025 09:47 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

From Tuesday, Sept. 16, until Tuesday, Sept. 30, 2025, Stop Willett St After Coronation Ave (8490) will be closed due to construction. Passengers on Routes 28 and 137 are directed to Stop Willett St After Frederick Ave (8502).

More info: halifax.ca/htdisruptions#8490

16.09.2025 09:45 β€” πŸ‘ 2    πŸ” 2    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

From Tuesday, Sept. 16, until Tuesday, Sept. 30, 2025, Stop Southgate Dr Before McQuillan Ln (2358) will be closed due to construction. Passengers on Routes 91 and 192 are directed to a temporary stop located near 120 Southgate Dr.

More info: halifax.ca/htdisruptions#2358

15.09.2025 19:17 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

From Tuesday, Sept. 16, until Tuesday, Sept. 30, 2025, Stop Willett St After Chadwick Pl (8488) will be closed. Passengers on Routes 2, 136, 137, and 138 are directed to a temporary stop located near 1 Sheradon Pl.

More info: halifax.ca/htdisruptions#8488

15.09.2025 19:15 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

A cartoon drawing of a construction barrier on a solid blue background. Above the construction barriers is the text "Construction Notice" in all white. The Halifax Transit logo is located at the top centre of the image.

From Tuesday, Sept. 16, until Tuesday, Sept. 30, 2025, Stop Willett St After Coronation Ave (8490) will be closed due to construction. Passengers on Routes 28 and 137 are directed to Stop Willett St After Frederick Ave (8502).

More info: halifax.ca/htdisruptions#8490

15.09.2025 19:07 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

@hfxtransit is following 2 prominent accounts