๐Ÿ‡บ๐Ÿ‡ฆ Joe LaRusso ๐Ÿ”Œ ๐Ÿ•ณ๏ธ ๐Ÿ‡'s Avatar

๐Ÿ‡บ๐Ÿ‡ฆ Joe LaRusso ๐Ÿ”Œ ๐Ÿ•ณ๏ธ ๐Ÿ‡

@jglarusso.bsky.social

Senior Advocate and Manager, Clean Grid Program at Acadia Center. This is my personal account. (He/him) ๐Ÿ“The ISO New England Control Area. โ€œIt is not granted to you to complete the task, yet neither may you give it up.โ€ ~Rabbi Tarfon.

2,043 Followers  |  446 Following  |  514 Posts  |  Joined: 18.11.2023  |  1.9109

Latest posts by jglarusso.bsky.social on Bluesky

Is it reasonable to assume that plans for the current outage were made sometime after April 2025, when Millstone 3 was offline for ~ 30 days? If the maintenance issue were known in April, presumably it would have been addressed during refueling, no, to avoid a second subsequent outage?

04.08.2025 04:58 โ€” ๐Ÿ‘ 1    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

๐Ÿคท๐Ÿผ

04.08.2025 01:44 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

โ€ฆspikes in production from other generating resources to replace Millstone 3. Everything indicates that ISO New England knew the Millstone 3 outage was coming, and that it was timed to cause the least disturbance to resource adequacy and reserve margins.

04.08.2025 01:35 โ€” ๐Ÿ‘ 4    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

โ€ฆwasnโ€™t planned, that is, for refueling, but it appears to have been planned to address some other maintenance/safety issue. So, a โ€œplanned unplannedโ€ outage. The tell-tale signs? The outage begins at 10:30 pm when demand is beginning to decline. No sudden increase in LMP prices, no suddenโ€ฆ

04.08.2025 01:35 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0

Now that I look at it again, the current Millstone 3 outage looks more like a โ€œplanned unplannedโ€ outage.

What does that mean?

Nuclear units plan outages to refuel. Millstone 3 refueled last April, and shouldnโ€™t have another planned refueling outage until ~ Oct. 2026. So the current outageโ€ฆ

04.08.2025 01:35 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Preview
What Happens When a Nuclear Plant Suddenly Shuts Off? Nearly instantaneously, a significant portion of nuclear generation in New England disappeared. This abrupt outage created measurable effects across the grid that we explore in this post.

Great piece by @gridstatus.io regarding a previousโ€”not the currentโ€”unplanned Millstone 3 outage. blog.gridstatus.io/isone-nuclea...

02.08.2025 12:12 โ€” ๐Ÿ‘ 3    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

In FY25 CPB received a federal allocation of $535 millionโ€”less than 0.01% of the total federal budget.

This is not a cost-cutting measure, it is part of the administrationโ€™s ongoing program to control broadcasting and broadcasting content.

The nation is being hollowed out and Rs must be stopped.

01.08.2025 19:00 โ€” ๐Ÿ‘ 2    ๐Ÿ” 2    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

Millstone 3 โ˜ข๏ธ experienced an unscheduled outage beginning ~ 10:30 pm last night. NRC reports 0% production.

01.08.2025 18:39 โ€” ๐Ÿ‘ 3    ๐Ÿ” 0    ๐Ÿ’ฌ 3    ๐Ÿ“Œ 1
Ethan Hawke Is Prepping A Zoom Production Of "Waiting For Godot"
YouTube video by The Late Show with Stephen Colbert Ethan Hawke Is Prepping A Zoom Production Of "Waiting For Godot"

I didnโ€™t have to wait long to find outโ€ฆ youtu.be/v1Wj9Ub3SWg?...

01.08.2025 04:43 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

Someone has to stage โ€œWaiting for Godotโ€ with Vladimir and Estragon in a Zoom room.

Guessing that, like all of my ideas, Someone thought of this long ago, and everyone but me knows where to find it online.

31.07.2025 22:02 โ€” ๐Ÿ‘ 2    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0

โ€œNo pierogies for you!โ€

31.07.2025 20:31 โ€” ๐Ÿ‘ 1    ๐Ÿ” 0    ๐Ÿ’ฌ 2    ๐Ÿ“Œ 0
Canadaโ€™s first four offshore wind energy areas have been designated on Nova Scotiaโ€™s offshore - Canada.ca The Government of Canada and the Province of Nova Scotia jointly designated the areas of French Bank, Middle Bank and Sable Island Bank off mainland Nova Scotia and Sydney Bight off Cape Breton for ev...

โ€œBy becoming an energy exporter, we can secure long-term prosperity for Nova Scotians.โ€

The time to think about transmission development, resource adequacy, reliability, resilience and energy security across the entire Northeast Power Coordinating Council (NPCC) footprint is now.

31.07.2025 10:45 โ€” ๐Ÿ‘ 5    ๐Ÿ” 1    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 1

It feels sort of worth noting that the Trump administration is doing all it can to make rcp 8.5 plausible again

30.07.2025 10:35 โ€” ๐Ÿ‘ 84    ๐Ÿ” 26    ๐Ÿ’ฌ 5    ๐Ÿ“Œ 0
Post image

A new analysis from @switch.box shows that 82% of MA households could see substantial winter heating savings with high-efficiency heat pumps under proposed rate reforms!

Read the full report: www.switch.box/mahprates

25.07.2025 17:26 โ€” ๐Ÿ‘ 2    ๐Ÿ” 2    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Preview
Massachusetts could give heat pump owners a huge discount onโ€ฆ The state will lower electricity rates for heat pump owners this winter, and is considering even deeper cuts to encourage residents to ditch fossil-fueledโ€ฆ

"The [Massachusetts] Department of Public Utilities is mulling a proposal to heavily discount electricity rates in the winter months for households with heat pumps." www.canarymedia.com/articles/hea... by Sarah Shemkus ๐Ÿ”Œ๐Ÿ’ก

25.07.2025 21:31 โ€” ๐Ÿ‘ 17    ๐Ÿ” 5    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 2

Twenty-three states produced 10% or more of their electricity from solar in May 2025.

Here are the top five:

1. California (45%)
2. Nevada (39%)
3. Massachusetts (33%)
4. Utah (26%)
5. Arizona (22%)

And barely edged out of the Top Five, No. 6 was โ€ฆ Maine (21%).

25.07.2025 11:11 โ€” ๐Ÿ‘ 8    ๐Ÿ” 4    ๐Ÿ’ฌ 2    ๐Ÿ“Œ 1
Preview
โ€˜Significant legal breakthroughโ€™ as NSW court blocks stateโ€™s largest coal expansion over emissions Decision is a significant blow for MACH Energyโ€™s Mount Pleasant coalmine expansion in Muswellbrook in the upper Hunter

Significant court decision 2 (by @lisacox.bsky.social)

www.theguardian.com/australia-ne...

24.07.2025 09:02 โ€” ๐Ÿ‘ 15    ๐Ÿ” 7    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0

Iโ€™m old enough to remember Sunshot.

23.07.2025 01:41 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

Iโ€™d own the asset. Build the portfolio. Be able to continue to pay people during the inevitable, future, periodic lean times. The team you build is the value worth preserving. They are the enterprise; but they are people with homes, families, lives. They are what the enterprise ought to be about.

23.07.2025 01:37 โ€” ๐Ÿ‘ 1    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

480-499 kWdc of aggregated, distributed rooftop solar?

22.07.2025 13:45 โ€” ๐Ÿ‘ 1    ๐Ÿ” 0    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0

There are twenty-eight wastewater treatment plants in Mass. that treat >5M gallons of effluent per day. Only six of them produce RNG via anaerobic digestion.

One of the six is the MWRA Deer Island treatment plant. The RNG offsets 97% of the plantโ€™s thermal load, and produces 17% of it electricity.

21.07.2025 16:39 โ€” ๐Ÿ‘ 2    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

Tortured by not one, but two regimes in a single lifetime.

21.07.2025 13:28 โ€” ๐Ÿ‘ 0    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

I havenโ€™t been able to find any info on the FY2025 budget for these facilities. Could they be alternatively funded? By whom?

21.07.2025 13:19 โ€” ๐Ÿ‘ 1    ๐Ÿ” 1    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Preview
EPA eliminates its scientific research arm The move to dismantle the Office of Research and Development comes as Trump officials cut the agencyโ€™s total staff by 23 percent.

Friday night massacre:

19.07.2025 11:58 โ€” ๐Ÿ‘ 172    ๐Ÿ” 73    ๐Ÿ’ฌ 7    ๐Ÿ“Œ 1
Preview
Solar canopies could come to the highway median along Route 2 in Lexington โ€” a first in the US If the pilot program is successful, the canopies could come to 400 miles of highway median in Massachusetts. But Trumpโ€™s โ€œBig Beautiful Billโ€ creates a roadblock.

First highway median solar project proposed in Massachusetts! 5 MW over 2 miles, but there are 400 total miles in MA alone viable for development. Let's make it happen! #EnergySky ๐Ÿ”Œ๐Ÿ’ก lexobserver.org/2025/07/11/g...

18.07.2025 17:41 โ€” ๐Ÿ‘ 22    ๐Ÿ” 6    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 0
Preview
Massachusetts test shows big savings from free heat pumps and solar Low-income residents on Cape Cod and Marthaโ€™s Vineyard who participated in a home electrification pilot saw their utility bills drop by more than half.

Massachusetts test shows big savings from free heat pumps and solar #energysky -- via Canary Media: www.canarymedia.com/...

18.07.2025 03:01 โ€” ๐Ÿ‘ 9    ๐Ÿ” 4    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0
Preview
The Truth Behind Californiaโ€™s High Electric Bills โ€” Episode 239 of Local Energy Rules - ILSR Energy Democracy Initiative Utility overspending, not rooftop solar, is driving Californiaโ€™s rising rates โ€“ Richard McCann debunks the โ€œcost shiftโ€ myth.

This.

ilsr.org/articles/tru...

16.07.2025 19:39 โ€” ๐Ÿ‘ 2    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

Low- or non-emitting resources (solar, wind, nuclear, hydro, price responsive demand) accounted for 42.3% of New Englandโ€™s total 2024 GWh generation.

Emitting resources represented 57.7% of New Englandโ€™s 2024 GWh generation.

16.07.2025 15:27 โ€” ๐Ÿ‘ 1    ๐Ÿ” 0    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

In 2024 solar wasโ€”in terms of GWh producedโ€”the third-largest electricity generating resource in New England.
โ€”โ€”
First, Gas, of course (58,883 GWh; 52.6% of total generation).

Second, Nuclear (26,547 GWh; 23.3%.

Third, Solar (9,820 GWh; 8.6%)

Fourth, Hydro (8,221 GWh; 7.2%)

โ€ฆetc.

16.07.2025 15:01 โ€” ๐Ÿ‘ 8    ๐Ÿ” 4    ๐Ÿ’ฌ 1    ๐Ÿ“Œ 1
Preview
Solar power reduced New England power grid demand by 5% in 2024 - ISO Newswire Contributions from behind-all-meters solar were equivalent to the power consumed by 600,000 homes in a year.

Behind-all-meter solar reduced New England grid demand 5% in 2024.

isonewswire.com/2025/07/09/s...

11.07.2025 19:03 โ€” ๐Ÿ‘ 3    ๐Ÿ” 1    ๐Ÿ’ฌ 0    ๐Ÿ“Œ 0

@jglarusso is following 20 prominent accounts