Infographic showing that 46 miles of tunnels have been excavated
Following the Elizabeth tunnel breakthrough, we've completed around 85% of tunnelling across the HS2 route✅.
Find out more: https://hs2.org.uk/tunnels
@hs2ltd.bsky.social
HS2 will provide more track, more trains, more seats and faster journeys to improve performance and reliability across Britain’s rail network.
Infographic showing that 46 miles of tunnels have been excavated
Following the Elizabeth tunnel breakthrough, we've completed around 85% of tunnelling across the HS2 route✅.
Find out more: https://hs2.org.uk/tunnels
📣 Our record breaking 2.1-mile long Colne Valley Viaduct is now structurally complete.
#construction #colnevalley #viaduct #infrastructure #engineering #hs2 #bridge #train #architecture #complete
The 125-metre-long machine began constructing the 3.5-mile (5.8km) Bromford Tunnel, which starts at the Warwickshire village of Water Orton and extends to the northeast Birmingham suburb of Washwood Heath, in July 2023.
10.05.2025 09:53 — 👍 1 🔁 0 💬 0 📌 1Specialist tunnelling teams spent 652 days and nights working underground to complete the mission.
10.05.2025 09:53 — 👍 2 🔁 0 💬 1 📌 0Our giant tunnelling machine Mary Ann has completed her 3.5-mile dig, marking the end of her mission to excavate the first bore of what will soon become the longest railway tunnel in the #WestMidlands.
Watch the impressive moment she broke though 🎥
youtu.be/Yywrn8wNsQk
We've successfully installed a 14,500-tonne box structure, which will carry the #HS2 line under the A46 in #Warwickshire.
The team will now complete drainage works and install a new road surface and markings, before reopening the road at 6am on Thursday, 1 May.
@nationalhighways.bsky.social