The start of the tunnelling for Montreal Metro's Blue Line extension!
08.08.2025 19:11 — 👍 4 🔁 1 💬 1 📌 0@railfans.ca.bsky.social
Dedicated to the exploration and discovery of rail public transit across Canada. www.RailFans.ca
The start of the tunnelling for Montreal Metro's Blue Line extension!
08.08.2025 19:11 — 👍 4 🔁 1 💬 1 📌 0Toronto’s Streetcars Are Great. We Just Don’t Treat Them Like It.
No other Canadian city has a streetcar network like this. So why do we treat it like an afterthought?
dbellerive.substack.com/p/torontos-s....
Post by @davidbellerive.bsky.social
A new video is rolling into the station this Monday. Be sure to subscribe so you catch it as soon as it drops.
youtube.railfans.ca
Ottawa's Stage 2 LRT is expanding O-Train service further West from Tunney's Pasture to Algonquin Station (Baseline). With plenty of questions surrounding what's next for the O-Train, we take a look at the proposed Stage 3 Extension into Barrhaven.
www.youtube.com/watch?v=QMFh...
Coming on Monday... to a YouTube channel near you!
31.07.2025 20:19 — 👍 2 🔁 0 💬 0 📌 0Orléans South is planned as a bus rapid transitway and not currently as rail unfortunately. That said, no solid idea when it would be built or move ahead. But I agree, it would be nice to see rail branch off from Blair to reach Innes and Orléans south of Innes.
29.07.2025 16:04 — 👍 0 🔁 0 💬 0 📌 0ICYMI: Explore the route and station locations of the proposed Kanata O-Train Extension in our latest video.
29.07.2025 14:53 — 👍 1 🔁 0 💬 1 📌 0construction update of the second deepest transit station in north america. édouard-montpetit rem station is due to open in fall 2025. #remmtl #montreal
29.07.2025 06:13 — 👍 11 🔁 1 💬 1 📌 0With plenty of questions surrounding what's next for the O-Train, we take a look at the proposed Stage 3 Extension into Kanata. From the planned routing, to the stations and locations, this is your full look at the currently proposed Line 3 expansion.
youtu.be/jiOJCViey1k
Integration Testing continued today on the O-Train's Eastern Extension to Orleans. Trains were circulating between Blair and Trim Stations at reduced speeds and frequencies. Very exciting to see the train pass over into the 174 highway median and stations.
youtu.be/fc9WlWc3CpQ
ICYMI: Trains were spotted running to Orléans on Saturday during East Extension testing! 🚊 You might still catch some today until 5pm. They're not at full speed and service is limited, so expect some gaps between sightings. #OttLRT #Stage2LRT
27.07.2025 14:40 — 👍 4 🔁 4 💬 0 📌 0Important to note that the trains seen in the video were not running at full speed. This was an integration test in which trains were running the entire line between Tunney’s Pasture and Trim, and passing through the transition between the original and new tracks.
27.07.2025 10:26 — 👍 0 🔁 0 💬 0 📌 0It’s just systems integration testing. They are not running at full speed during the video captured.
27.07.2025 01:57 — 👍 1 🔁 0 💬 0 📌 0The O-Trains Eastern extension to Orleans is nearing completion, and some final major milestones are now being reached. In this video, we captured some of the train testing that took place over the weekend of July 26-27, 2025, as part of the integration testing.
youtu.be/f4qPBVnDE-4
Coming this Monday…
What’s Next for the O-Train: Line 3 to Kanata Explained.
What comes after Stage 2 of Ottawa’s O-Train?
We’re heading west to explore the proposed Kanata Extension of Line 3. It’s not approved or funded yet, but detailed plans exist—and we’re diving into the route, stations, and how it could work.
🎥 New video soon!
Hello Mimo, if you are interested in some updates on Stage 2 East and West, we created videos showing the current progress, which you can find here for the East youtu.be/8-7mo-r06Kg & West youtu.be/rTprweIm0oA. Plenty more on our channel too. Enjoy!
22.07.2025 22:57 — 👍 4 🔁 0 💬 1 📌 0ICYMI : We take you trackside to discover the latest progress on the O-Train's Stage 2 Western Extension. Lots of on-location and drone footage to make sure you get the complete picture.
22.07.2025 21:19 — 👍 0 🔁 0 💬 0 📌 0Laptop and cell phone displaying OC Transpo's Bluesky social media page on a bright blue background with announcement text.
🚀 We’re officially live on Bluesky!
We’re excited to be part of the conversation and connect with you in new ways.🥳
Follow us for transit updates, news, and helpful info about our services. Need support? We’re just a post away. 🤝
Rail Fans Canada takes you trackside for an in-depth update on Ottawa’s expanding LRT system. In this July 2025 video, we cover the latest construction progress on the O-Train Stage 2 West Extension, stretching from Tunney's Pasture to Algonquin & Moodie. youtu.be/rTprweIm0oA
21.07.2025 12:59 — 👍 5 🔁 2 💬 0 📌 2Welcome aboard this northbound Line 2 train. Our next stop will be Carleton, with continuing service to Bayview and Line 1. #ottawa #octranspo
16.07.2025 16:14 — 👍 3 🔁 0 💬 0 📌 0The next train departs for a trip on Ottawa’s O-Train system. Where will the train take you today?
15.07.2025 16:03 — 👍 3 🔁 0 💬 2 📌 0ICYMI: Ride with us as we checkup on the latest progress on the O-Train’s East Extension.
15.07.2025 15:57 — 👍 0 🔁 0 💬 0 📌 0Rail Fans Canada takes you trackside for an in-depth update on Ottawa’s expanding LRT system. In this July 2025 video, we cover the latest construction progress on the O-Train Stage 2 East Extension, stretching from Blair Station to Trim Road in Orléans. www.youtube.com/watch?v=8-7m...
14.07.2025 12:57 — 👍 7 🔁 0 💬 0 📌 1We Know How to Build Better Infrastructure. So Why Don’t We It’s not a technical problem—it’s a cultural one. @davidbellerive.bsky.social explores some of the things we can do differently.
dbellerive.substack.com/p/we-know-ho...
Watch the video here: youtu.be/oDAoxqUGC0E
07.07.2025 12:58 — 👍 0 🔁 0 💬 0 📌 0EXCLUSIVE Sneak Peek of Montreal Station: The Eastern Extension of O-Train Lines 1/3. Join us as we go Behind the Scenes with Mary-Ellen Gleeson, Manager of Construction for Stage 2, who shares her expertise and insights on the station and project.
**Link in the comments below.**
Montreal Station is very inviting, with lots of natural light, great design, and layout... it will certainly rank highly on the O-Train station lineup once it opens.
05.07.2025 01:33 — 👍 5 🔁 2 💬 1 📌 0Stay tuned for a behind-the-scenes visit to Montreal Station on our YouTube channel in the coming days. #ottawa
04.07.2025 16:38 — 👍 5 🔁 1 💬 0 📌 1Starting Saturday until August 17, the REM will be closed for testing, integration and final works for readying the two new branches planned to open later this year.
04.07.2025 10:34 — 👍 10 🔁 1 💬 1 📌 0