Edward Tissiman's Avatar

Edward Tissiman

@edtiss.bsky.social

From Forres. Live in Edinburgh. Finished the Munros in 2021. Care about cycling and other stuff. https://medium.com/@edward.tissiman

621 Followers  |  104 Following  |  182 Posts  |  Joined: 15.08.2024  |  2.2833

Latest posts by edtiss.bsky.social on Bluesky

Currently having a coffee in John Lewis and can count 19 illegally parked cars at Elm Row.

I'm glad that's not my commute any more. I think I'd have cracked by now.

07.02.2026 11:41 β€” πŸ‘ 11    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0
A "floating bus stop" with cycle lanes infront and behind. Behind the bus stop is pavement which is covered in parked cars, which also block the painted crossing point

A "floating bus stop" with cycle lanes infront and behind. Behind the bus stop is pavement which is covered in parked cars, which also block the painted crossing point

An exhibit for the floating bus stop discourse 🧐

06.02.2026 12:12 β€” πŸ‘ 55    πŸ” 12    πŸ’¬ 8    πŸ“Œ 3

Another casualty as another car hits another bus stop. Almost as if the real safety issue at bus stops isn’t the schemes to make them accessible for school kids to pass on bikes.

23.01.2026 09:48 β€” πŸ‘ 46    πŸ” 17    πŸ’¬ 7    πŸ“Œ 0

We have over 2,000 cyclists a day passing the Omni Centre bus stops - if they were as dangerous as some suggest then the paper would be full of stories of people getting badly injured. The same for Leith Walk - a significant *reduction* in pedestrian casualties now the trams and cycle lanes are in.

23.01.2026 17:15 β€” πŸ‘ 14    πŸ” 3    πŸ’¬ 1    πŸ“Œ 0
Post image

Elm Row "cycle" lane.

15.01.2026 15:48 β€” πŸ‘ 22    πŸ” 5    πŸ’¬ 4    πŸ“Œ 3
Post image

Final stats for the Omni Centre cycle lane in 2025: a slight 1% increase on 2024 with 580,000 journeys; a new record set of 2,265 cyclists on Friday, 7th November.

The significant increase in numbers in prior years came after the development of cycling infrastructure on Leith Walk.

09.01.2026 08:33 β€” πŸ‘ 17    πŸ” 4    πŸ’¬ 2    πŸ“Œ 0
Post image

This one was so long it went into the rim and nearly bounced me off the bike.

Replacing a wheel was not something I had planned for 2026...

07.01.2026 10:06 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 3    πŸ“Œ 0
Preview
Edinburgh cabbie who hit pedestrian trying to beat a red light keeps licence An Edinburgh cabbie who hit a pedestrian with his taxi while trying to beat a red signal has been allowed by the council to keep his licence.

Some Christmas cheer for people walking around Edinburgh /s

www.edinburghnews.scotsman.com/news/edinbur...

16.12.2025 08:21 β€” πŸ‘ 11    πŸ” 1    πŸ’¬ 2    πŸ“Œ 1

🚧 Powderhall / St Mark’s Path – Update
Good news: the path will reopen from Fri 19 Dec to Sun 4 Jan while construction pauses, giving everyone on Quiet Route 20 a safer, more direct link over the festive period.
Council still reviewing options for a better route during future closures.

05.12.2025 15:14 β€” πŸ‘ 9    πŸ” 9    πŸ’¬ 0    πŸ“Œ 1
Post image

The normalisation of parking on zig zags in Edinburgh. A pedestrian crossing on Broughton Road. KY24 OAV. No sign of a driver.

14.12.2025 10:56 β€” πŸ‘ 14    πŸ” 3    πŸ’¬ 1    πŸ“Œ 0
Post image

Impressed by @corneliusbeers.bsky.social impromptu same-day bicycle delivery. I guess they fit in the bottle cages?

11.12.2025 21:09 β€” πŸ‘ 5    πŸ” 1    πŸ’¬ 0    πŸ“Œ 0
Preview
More Voi bikes available as scheme expands south andΒ west The Voi bike hire scheme is to expand south to King's Buildings and west to Roseburn from Wednesday. In the next fortnight there will be more bikes placed at designated parking in the city taking the number of electric bikes available to 480. The company says it has another 120 available but will monitor demand for now. If residents know of a suitable parking space then they are invited to get in touch with the company.

More Voi bikes available as scheme expands south andΒ west

The Voi bike hire scheme is to expand south to King's Buildings and west to Roseburn from Wednesday. In the next fortnight there will be more bikes placed at designated parking in the city taking the number of electric bikes available to…

09.12.2025 15:24 β€” πŸ‘ 5    πŸ” 1    πŸ’¬ 0    πŸ“Œ 1
Photo of the extremely narrow section of the Ferry Road path behind Leonardo where they've pushed the temporary fence back out to where it pretty much obstructs the entire path again, especially when it's wet and the grass verge beside the path is already slippy and muddy.

Photo of the extremely narrow section of the Ferry Road path behind Leonardo where they've pushed the temporary fence back out to where it pretty much obstructs the entire path again, especially when it's wet and the grass verge beside the path is already slippy and muddy.

Photo of the extremely narrow section of the Ferry Road path behind Leonardo where they've pushed the temporary fence back out to where it pretty much obstructs the entire path again, especially when it's wet and the grass verge beside the path is already slippy and muddy.

Photo of the extremely narrow section of the Ferry Road path behind Leonardo where they've pushed the temporary fence back out to where it pretty much obstructs the entire path again, especially when it's wet and the grass verge beside the path is already slippy and muddy.

#EdTravCyc Ferry Road path behind Leonardo down to less than 30cm in places where they've pushed the temporary fence back out without leaving enough space to pass. No way anything other than a narrow standard cycle can get past there without going on the (squelchy, muddy) grass...

27.11.2025 22:38 β€” πŸ‘ 5    πŸ” 1    πŸ’¬ 2    πŸ“Œ 1
The driver of a black BMW SUV has overrun the parking bay and knocked over a concrete bollard. The SUV is on the pavement and has been partly lifted up by the bollard. The front of the vehicle is crumpled. It has a vanity licence plate GLS 7. The pavement and road are damp. There are sandstone city centre buildings in the background. The zigzag white no parking lines of a pedestrian crossing can be seen

The driver of a black BMW SUV has overrun the parking bay and knocked over a concrete bollard. The SUV is on the pavement and has been partly lifted up by the bollard. The front of the vehicle is crumpled. It has a vanity licence plate GLS 7. The pavement and road are damp. There are sandstone city centre buildings in the background. The zigzag white no parking lines of a pedestrian crossing can be seen

These vehicles pose significantly greater safety risks, with children *eight times* more likely to die if struck by an SUV and cyclists suffering much more severe injuries

Market St, Edinburgh. Right outside the busy Waverley station entrance

transform.scot/2025/11/20/t...

24.11.2025 11:24 β€” πŸ‘ 35    πŸ” 4    πŸ’¬ 8    πŸ“Œ 2
Preview
Cycle parking Find out more about security, parking and storage

More cycle hangars are currently being installed now on Halmyre Street, Thorntree Street, Pilrig Street, Springfield, & East Claremont Street.

These fill up pretty fast so it may be worth checking out the Greasemonkey website in the coming weeks. www.edinburgh.gov.uk/cycling-walk...

21.11.2025 23:20 β€” πŸ‘ 11    πŸ” 2    πŸ’¬ 0    πŸ“Œ 0
Post image

*All-time record* set at the Omni Centre cycle lane on the 7th November - 2,265 cycle journeys.

I can only speculate that the rollout of Voi e-bikes has significantly boosted cycling in Edinburgh this autumn, bucking the seasonal trend.

21.11.2025 19:35 β€” πŸ‘ 35    πŸ” 7    πŸ’¬ 1    πŸ“Œ 0

Does anyone know if there needs to be some sort of risk assessment on this? Sending thousands of cyclists around Crewe Toll, and with only two days notice, is absolutely insane.

21.11.2025 16:31 β€” πŸ‘ 5    πŸ” 1    πŸ’¬ 2    πŸ“Œ 0

Edinburgh Council once again demonstrating what they really think about walking, cycling, running in this city.

This is the equivalent to closing the bypass for two months and directing drivers over the top of the Pentlands.

21.11.2025 16:27 β€” πŸ‘ 16    πŸ” 6    πŸ’¬ 2    πŸ“Œ 0
Post image

Well done to Edinburgh Police for calling what these things are - motorcycles.

I hope the rider recovers from his injuries soon.

15.11.2025 14:46 β€” πŸ‘ 16    πŸ” 3    πŸ’¬ 1    πŸ“Œ 0

Let's not get excited - what's the wait time going to be like at rush hour?

13.11.2025 12:41 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

I raised this at Transport Committee today. Officers are checking with colleagues in signals and will report back. They did agree that 10 min wait "seems excessive" πŸ™„

13.11.2025 11:29 β€” πŸ‘ 8    πŸ” 2    πŸ’¬ 1    πŸ“Œ 0
Cllr Booth

Cllr Booth

Bluesky Report of 10 mins wait to cross

β€ͺEdward Tissiman‬
 β€ͺ@edtiss.bsky.social‬
Β· 17h
Currently a 10 minute wait for pedestrians/cyclists at the London Road/Leith Walk junction. 

On a typical 1 mile walking commute, 1/3rd of it could spent waiting at this single junction. 

Pathetic from Edinburgh Council, who claimed that the changes here would have no impact on active travel.

Bluesky Report of 10 mins wait to cross β€ͺEdward Tissiman‬ β€ͺ@edtiss.bsky.social‬ Β· 17h Currently a 10 minute wait for pedestrians/cyclists at the London Road/Leith Walk junction. On a typical 1 mile walking commute, 1/3rd of it could spent waiting at this single junction. Pathetic from Edinburgh Council, who claimed that the changes here would have no impact on active travel.

#EdinWebCast

Q: Cllr @chasbooth.bsky.social says new left turn #ElmRow --> #LondonRoad reported to cause long delays (up to 10 mins!) to πŸšΆπŸ‘©β€πŸ¦ΌπŸš²crossing

A: Officer surprised if so but will investigate & report to ward councillors

@edtiss.bsky.social @jackrmcaldwell.bsky.social @mcdmartin.bsky.social

13.11.2025 11:24 β€” πŸ‘ 7    πŸ” 2    πŸ’¬ 2    πŸ“Œ 0
Video thumbnail

Not sure if it’s officially officially open yet as the entrance on Dock Street still has fencing - but the Leith Connections section along Sandport has had all barriers removed and is a JOY to ride!

Want to ride along? 😁

@edi.bike

10.11.2025 14:52 β€” πŸ‘ 41    πŸ” 9    πŸ’¬ 2    πŸ“Œ 1

I can't imagine how frustrating this stuff is if you're blind, disabled, got kids and so on. 10 minutes! And to think pedestrians are top of the hierarchy. Empty rhetoric.

12.11.2025 17:57 β€” πŸ‘ 8    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

Thanks to @mcdmartin.bsky.social for taking the time.

@livingstreetsedi.bsky.social @spokes.org.uk @jackrmcaldwell.bsky.social

12.11.2025 17:54 β€” πŸ‘ 5    πŸ” 1    πŸ’¬ 1    πŸ“Œ 0

Currently a 10 minute wait for pedestrians/cyclists at the London Road/Leith Walk junction.

On a typical 1 mile walking commute, 1/3rd of it could spent waiting at this single junction.

Pathetic from Edinburgh Council, who claimed that the changes here would have no impact on active travel.

12.11.2025 17:52 β€” πŸ‘ 18    πŸ” 9    πŸ’¬ 1    πŸ“Œ 0

Good effort - I'm going to pop up there tomorrow to do some proper timings on Picardy Place.

12.11.2025 17:47 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

What's a bit sad is my life has measurably improved because I no longer have to deal with the frustration of Leith Walk. I actively avoid it via Easter Road.

It's nice for a wee shopping trip (walking) at the weekend but otherwise...

11.11.2025 23:17 β€” πŸ‘ 5    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

They've resolved the motor vehicle issue by making pedestrians take 30 mins to get through the endless series of junctions and crossings. Success, I guess.

11.11.2025 22:05 β€” πŸ‘ 15    πŸ” 1    πŸ’¬ 0    πŸ“Œ 0

@edtiss is following 19 prominent accounts