1) Great way to bypass JTIQ charges!
2) Could immediately create a large market for selling existing interconnection service.
3) Tired of waiting for network upgrades? Just jump to the front of the line!
@davidmindham.bsky.social
Many years of experience in transmission and market policy. Thoughts are my own.
Some interesting things:
1) Great way to bypass JTIQ charges!
2) Could immediately create a large market for selling existing interconnection service.
3) Tired of waiting for network upgrades? Just jump to the front of the line!
Crazy RTO Policy of the day: MISO proposes allowing existing generators to move their interconnection service to other places on the grid, bypassing the interconnection queues. They are using a 5% dfax to determine whether or not the movement is material. Could move a generator 100s of miles...
18.11.2024 19:46 β π 2 π 0 π¬ 2 π 0It's in the Trades protest: elibrary.ferc.gov/eLibrary/fil...
15.11.2024 18:22 β π 1 π 0 π¬ 0 π 0It's amazing how a proposal that "only benefits IPPs" was universally opposed by them. This will cause huge shifts in the market away from competitive generation supply and towards vertically integrated supply. I wrote testimony in the docket that tried to quantify these costs which was ignored...
15.11.2024 17:46 β π 1 π 0 π¬ 1 π 0Kind of a big deal. This week, FERC approved filings from MISO and SPP that will finance construction of high-voltage transmission to enable the connection of 30 GW of wind, solar, and storage. Yet, many clean energy developers opposed the plan - ππ‘ elibrary.ferc.gov/eLibrary/fil...
15.11.2024 17:29 β π 61 π 17 π¬ 3 π 3