Kyle Constable's Avatar

Kyle Constable

@kyleconstable.bsky.social

β€œA Connecticut Yankee in Sir Walter Raleigh’s Court.” Audience at The Assembly NC. Sometimes I make music. Proud UConn alum. Husky forever. Posts about πŸ“° 🎢 🧠 πŸͺ πŸ₯Ύ πŸ€ πŸ•β€πŸ¦Ί. P'nouns: he/him

375 Followers  |  145 Following  |  90 Posts  |  Joined: 18.10.2023  |  1.912

Latest posts by kyleconstable.bsky.social on Bluesky

πŸ™ˆπŸ™ŠπŸ™‰

29.01.2025 03:43 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

For the first time in Hurley's time at UConn, the roster feels worse than the sum of its parts and that's a bummer. The karmic scale evening out after two years of perfect roster construction.

26.01.2025 03:22 β€” πŸ‘ 13    πŸ” 1    πŸ’¬ 1    πŸ“Œ 0

Hi, everybody! Jon here. Unfortunately, since ChatGPT is down at the moment, I'm unable to generate my usual Bluesky posts. As soon as it's up and running again, I'll be able to resume the sorts of posting you've come to expect from me over the years. Thanks all.

23.01.2025 14:44 β€” πŸ‘ 9907    πŸ” 291    πŸ’¬ 177    πŸ“Œ 12
Hartford Line Double tracking slide which contains the following text explaining the scope of the project summarized here: 
Project Location
Th NHHS Rail Program Phase 3B Double-track Project is spread out across three track sections along the New Haven – Hartford – Springfield
(NHHS) rail line, which spans from New Haven, Connecticut to Springfield, Massachusetts. Separated into three distinct locations, the track
sections include: West Hartford/Hartford; Windsor/Windsor Locks and Enfield.
Purpose and Need
The purpose of the NHHS Program is to increase the frequency and speed of passenger rail service along the NHHS rail corridor and to address
the current and future intercity transportation needs of Connecticut, Central Massachusetts, Boston, and Vermont. In addition, the NHHS
Program will enhance the regional commuter rail service on the CTrail Hartford Line provided by CTDOT.

Hartford Line Double tracking slide which contains the following text explaining the scope of the project summarized here: Project Location Th NHHS Rail Program Phase 3B Double-track Project is spread out across three track sections along the New Haven – Hartford – Springfield (NHHS) rail line, which spans from New Haven, Connecticut to Springfield, Massachusetts. Separated into three distinct locations, the track sections include: West Hartford/Hartford; Windsor/Windsor Locks and Enfield. Purpose and Need The purpose of the NHHS Program is to increase the frequency and speed of passenger rail service along the NHHS rail corridor and to address the current and future intercity transportation needs of Connecticut, Central Massachusetts, Boston, and Vermont. In addition, the NHHS Program will enhance the regional commuter rail service on the CTrail Hartford Line provided by CTDOT.

Project slide for Platform Replacement on the Waterbury Branch
Project Location
This project is located at the existing Metro-North Railroad (MNR) Waterbury Branch
Line stations encompassing Derby, Ansonia, Seymour, Beacon Falls, and Waterbury.
Purpose and Need
The existing at grade level platforms at the Derby, Ansonia, Seymour and Beacon
Falls, as well as the existing short high-level platform at Waterbury Station will be
replaced with 350ft long high-level heated fiber-reinforced platforms to maintain
compliance with both State and Metro-North Railroad safety and design standards
and to ensure safe and efficient boarding of the rail cars. The new platforms will also
meet ADA compliance which are currently deficient at most of these stations.
Scope of Work
The new high-level platforms will be approximately 350 feet in length and will be
able to support all prescribed loads per MTA (Metro Transit Authority) MNR Station
Standards and guidelines. The platforms will include rubrail, a tactile warning edge,
emergency egress as required by code and will be accessible by ADA-compliant
ramps, stairs, handrails, and sidewalks from the public way. There will be canopies,
windbreaks, benches, and trash receptacles throughout the length of the new
platforms. In addition, new LED lighting, fire alarm devices, VMS, ticket vending
machines, and station signage will be included in the design. At Derby-Shelton, the
existing historic station building will be renovated into an indoor waiting area with
bathrooms. There will also be electric bus chargers and car chargers.

Project slide for Platform Replacement on the Waterbury Branch Project Location This project is located at the existing Metro-North Railroad (MNR) Waterbury Branch Line stations encompassing Derby, Ansonia, Seymour, Beacon Falls, and Waterbury. Purpose and Need The existing at grade level platforms at the Derby, Ansonia, Seymour and Beacon Falls, as well as the existing short high-level platform at Waterbury Station will be replaced with 350ft long high-level heated fiber-reinforced platforms to maintain compliance with both State and Metro-North Railroad safety and design standards and to ensure safe and efficient boarding of the rail cars. The new platforms will also meet ADA compliance which are currently deficient at most of these stations. Scope of Work The new high-level platforms will be approximately 350 feet in length and will be able to support all prescribed loads per MTA (Metro Transit Authority) MNR Station Standards and guidelines. The platforms will include rubrail, a tactile warning edge, emergency egress as required by code and will be accessible by ADA-compliant ramps, stairs, handrails, and sidewalks from the public way. There will be canopies, windbreaks, benches, and trash receptacles throughout the length of the new platforms. In addition, new LED lighting, fire alarm devices, VMS, ticket vending machines, and station signage will be included in the design. At Derby-Shelton, the existing historic station building will be renovated into an indoor waiting area with bathrooms. There will also be electric bus chargers and car chargers.

Project slide for Derby-Shelton railroad station

Project Location
This project is located in Derby on Main Street east of State Route 8, at
Metro-North Railroad Milepost (MP) 8.9 on the Waterbury Branch Line.
Purpose and Need
This project aims to improve the station to ADA standard requirements and
the latest station amenities. Improvements to the Waterbury Line have
been a state, regional, and local priority for many years.
Scope of Work
The Derby Station will provide a fully ADA compliant accessible station with
a high-level heated fiber-reinforced polymer platform with a snow melt
system, full length canopy, and windscreen. A timber canopy covers the
entire length of the platform, and the existing adjacent station building will
be integrated with the canopy design. In addition to significantly upgrading
the existing station, the new platforms will enable faster boarding,
enhanced safety and security, passenger amenities will be fully accessible
for all commuters. Traveler amenities include passenger waiting area,
passenger sign displays, public restrooms, variable message signs, audio
messaging, public vehicle and bus charging stations, and rest area for bus
employees

Project slide for Derby-Shelton railroad station Project Location This project is located in Derby on Main Street east of State Route 8, at Metro-North Railroad Milepost (MP) 8.9 on the Waterbury Branch Line. Purpose and Need This project aims to improve the station to ADA standard requirements and the latest station amenities. Improvements to the Waterbury Line have been a state, regional, and local priority for many years. Scope of Work The Derby Station will provide a fully ADA compliant accessible station with a high-level heated fiber-reinforced polymer platform with a snow melt system, full length canopy, and windscreen. A timber canopy covers the entire length of the platform, and the existing adjacent station building will be integrated with the canopy design. In addition to significantly upgrading the existing station, the new platforms will enable faster boarding, enhanced safety and security, passenger amenities will be fully accessible for all commuters. Traveler amenities include passenger waiting area, passenger sign displays, public restrooms, variable message signs, audio messaging, public vehicle and bus charging stations, and rest area for bus employees

Project slide for new Naugatuck railroad station

Project Location
This project is located in Naugatuck on Water Street south of Maple Street, at
Metro-North Railroad Milepost (MP) 21.6 on the Waterbury Branch Line.
Purpose and Need
The purpose of this project is to improve the Naugatuck station to ADA
standard requirements and add station amenities. Improvements to the
Waterbury Line have been a state, regional and local priority for many years. In
addition, the new station location will be a catalyst for Transit Oriented
Development (TOD) consistent with the Borough of Naugatuck ’s vision.
Scope of Work
The Naugatuck Railroad Station Project will replace the existing station by
constructing a new station approximately 0.3 miles south of the current
location. The new Naugatuck Station will provide a fully ADA compliant
accessible station with a high-level platform, provide 80 parking spaces, as
well as other traveler amenities and security items. Traveler amenities
included, passenger waiting area, passenger sign displays, variable message
signs, audio messaging, and vehicle charging. Platforms will include snow melt
system and canopy. A parking lot will be constructed as part of the project to
provide the 80 spaces and will include open parking revenue system

Project slide for new Naugatuck railroad station Project Location This project is located in Naugatuck on Water Street south of Maple Street, at Metro-North Railroad Milepost (MP) 21.6 on the Waterbury Branch Line. Purpose and Need The purpose of this project is to improve the Naugatuck station to ADA standard requirements and add station amenities. Improvements to the Waterbury Line have been a state, regional and local priority for many years. In addition, the new station location will be a catalyst for Transit Oriented Development (TOD) consistent with the Borough of Naugatuck ’s vision. Scope of Work The Naugatuck Railroad Station Project will replace the existing station by constructing a new station approximately 0.3 miles south of the current location. The new Naugatuck Station will provide a fully ADA compliant accessible station with a high-level platform, provide 80 parking spaces, as well as other traveler amenities and security items. Traveler amenities included, passenger waiting area, passenger sign displays, variable message signs, audio messaging, and vehicle charging. Platforms will include snow melt system and canopy. A parking lot will be constructed as part of the project to provide the 80 spaces and will include open parking revenue system

Details on some of Connecticut's rail improvement projects planned for 2025

19.01.2025 23:02 β€” πŸ‘ 22    πŸ” 6    πŸ’¬ 1    πŸ“Œ 0
COVID Home Tests | USPS COVID Home Tests | USPS

Here's a small weird potentially good thing: The USPS website is still, as of a few minutes ago, processing requests under the free covid test program. No idea when that'll be shut down, but it hasn't been yet.

19.01.2025 14:15 β€” πŸ‘ 1765    πŸ” 1037    πŸ’¬ 56    πŸ“Œ 39

More men’s than women’s, but it feels like the women have struggled to play a full 40 minutes this season and it’s cost them in the biggest matchups so far

19.01.2025 18:34 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

Come back soon, Liam. We need you.

18.01.2025 20:19 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

Karaban tried to play through an injury and missed a TON of shots. Our bigs were completely ineffective against Kalkbrenner.

Those are two biggest storylines today.

Not a botched foul call. Not defense. Not a supposed lack of β€œtoughness.”

18.01.2025 20:18 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

Why in the world is Dan Hurley talking about defense and toughness in a game where we held Creighton under 70 and only scored 63 ourselves? As a top-five offense nationally (now top 10), it seems pretty obvious what our largest deficiency was today.

18.01.2025 20:16 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

This season of UConn basketball is hurting me

18.01.2025 19:49 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

A genuinely abysmal take.

Time is the point. Time is mandatory. The overwhelming majority of music creation is digging and digging and digging through shit in order to manifest something, try to pinch it out of the air, and uncover what was buried inside you the whole time. It's actual magic.

13.01.2025 01:50 β€” πŸ‘ 72    πŸ” 7    πŸ’¬ 3    πŸ“Œ 0
Post image

how in the

12.01.2025 21:52 β€” πŸ‘ 1074    πŸ” 104    πŸ’¬ 27    πŸ“Œ 38
Preview
Where Did the General Assembly Go to College? The colleges North Carolina’s legislators attended reveals different backgrounds that may shape how they tackle higher education issues.

This matters more than you might think.

In my years covering higher education in NC, where decision makers β€” lawmakers and their appointees β€” went to school and what their experiences were heavily influenced their views and their votes.

www.theassemblync.com/education/hi...

12.01.2025 16:52 β€” πŸ‘ 6    πŸ” 4    πŸ’¬ 1    πŸ“Œ 1

Snow!

10.01.2025 21:38 β€” πŸ‘ 28    πŸ” 6    πŸ’¬ 1    πŸ“Œ 0

And God said, β€œLet there be a wintry mix upon the Southeast”

10.01.2025 22:49 β€” πŸ‘ 2    πŸ” 1    πŸ’¬ 0    πŸ“Œ 0
Post image

Today, we work with more than 150 freelance reporters and photographers across the state, as well as 39 full-time staff including teams in Wilmington, Greensboro, Fayetteville, and the Triangle.

31.12.2024 21:55 β€” πŸ‘ 8    πŸ” 3    πŸ’¬ 1    πŸ“Œ 0

it seems like there are more and more years each and every year

01.01.2025 03:24 β€” πŸ‘ 2380    πŸ” 295    πŸ’¬ 53    πŸ“Œ 7
Preview
Be Easy A Will Away Β· Bliss Β· Song Β· 2015

open.spotify.com/track/1Mklyd...

28.12.2024 04:21 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

Be easy.

28.12.2024 04:16 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

my armchair psychological diagnosis is that the drive to accumulate as much wealth as possible eats away at the drive for self-improvement or the internal desire to cultivate any skills or tastes. these people build huge mounds of treasure and then essentially just sit around looking at it, empty.

27.12.2024 21:28 β€” πŸ‘ 15138    πŸ” 1944    πŸ’¬ 626    πŸ“Œ 263

Struggling to comprehend how this can happen to such a wonderful young person. Christie was a standout writer for @UConnResearch during her time as a student and graduate. Our hearts are heavy and our thoughts are with Christie's family and friends.

23.12.2024 14:16 β€” πŸ‘ 1    πŸ” 1    πŸ’¬ 0    πŸ“Œ 0
Preview
Memorial Page for Christie Wang Obituary and memorial page for Christie Wang

Absolutely heartbroken reading through the tributes to Christie Wang, one of my β€œFab Five” interns at @ctmirror.org and an all-around wonderful human being.

She clearly touched so many lives.

Please consider a donation to the Christie Wang Memorial Fund.

memorialsource.com/memorial/chr...

21.12.2024 03:04 β€” πŸ‘ 2    πŸ” 1    πŸ’¬ 0    πŸ“Œ 1
Post image

Thankful for my constant companion during this challenging week ❀️

20.12.2024 03:10 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

You think this wasn’t a great game but you have to remember we were also playing against a curse.
When you factor that in - not bad.

19.12.2024 02:44 β€” πŸ‘ 8    πŸ” 1    πŸ’¬ 0    πŸ“Œ 0

Bottom right. New Haven-style. It’s not even a contest.

16.12.2024 03:48 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0
Post image Post image

The Great Tree, from mid-spring to late fall

15.12.2024 16:03 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

Most of it comes down to Ike’s performance. Our defense deserves a huge amount of credit but there may have been some luck in the mix too. Either way, it was enough to offset our own offensive shortcomings

15.12.2024 04:12 β€” πŸ‘ 3    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

You guys... I think UConn might be good again

15.12.2024 03:50 β€” πŸ‘ 15    πŸ” 1    πŸ’¬ 1    πŸ“Œ 0

UConn atones for its pratfall in Maui by beating Baylor, then winning @ Texas, and now taking out Gonzaga at MSG, 77-71.

Huskies have won eight straight vs. top-10 teams.

Gonzaga's lost back-to-back games. That last happened in Dec. of '18. Coming up in 2 mins CBS Sports HQ on your CBS Sports app

15.12.2024 03:27 β€” πŸ‘ 35    πŸ” 3    πŸ’¬ 1    πŸ“Œ 1

β€œThe way I would never paint my body for DePaul.”

β€” @kpuconn14.bsky.social, with no respect for the Big East’s rising star

15.12.2024 02:33 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

@kyleconstable is following 20 prominent accounts