Right now both should be expanded. It's not either. Again, if you don't plan firm power ahead you'll end up building gas because it's faster and too late. Even Norway understands this, hence they want nuclear too
26.08.2025 16:00 β π 0 π 0 π¬ 0 π 0
Production is adapted each year. 2025 had 13% increase vs last year
26.08.2025 15:27 β π 1 π 0 π¬ 0 π 0
That's true. So you deploy different tech to alleviate this problem.
The situation also looks very different in the magnitude - it's extremely rare to get all nuclear fleet down to 5-10% production at the same time. Especially when you have more units (hence smaller reactors do have a benefit here)
26.08.2025 15:07 β π 0 π 0 π¬ 1 π 0
So again, wind is nice and should be expanded where it makes sense, esp to avoid some drought problems like Norway has faced. But you still need more firm power. If you don't start planning for nuclear now, gas will be planned later because it's too late to plan for nuclear
26.08.2025 14:17 β π 0 π 0 π¬ 1 π 0
And that's based on a day GWh average. The actual production in that day in some timeframes could have been even lower. On first febr offshore CF in Germany was about 3.6%. in 19Feb- 2.2%. these are daily averages so min production could have been worse (I don't have per hour data sadly)
26.08.2025 14:15 β π 0 π 0 π¬ 1 π 0
Last year's winter, cumulative wind+solar CF in the whole EU dropped significantly for 2-3 days several times.
It's hard to find data for Sweden, but say for DK on 5-7 november offshore generated at about 4-8% (1-2GWh vs 2.7GW installed). In Germany it was similar with 6% for offshore those days
26.08.2025 14:11 β π 0 π 0 π¬ 2 π 0
On the other hand I'm optimistic about BWRX timelines. Both Sweden and Hitachi have great BWR experience and BWRX is similar in many ways to ABWR that was already built in the past. They have all the chances to beat EDF in this by a mile
26.08.2025 13:10 β π 0 π 0 π¬ 0 π 0
Nuclear rises the bar by 1GW. Offshore can still play along with hydro modulation and help with droughts, but you no longer have supply issues. And rather than waiting when demand reaches 5GW(hypothetical) you better start building nuclear when peak demand is still 2-3GW considering delays
26.08.2025 13:08 β π 0 π 0 π¬ 2 π 0
Offshore wind will not solve the lack of firm power. It can help for drought periods to save hydro and sometimes reduce gas. But if your total demand rises to say 5GW and hydro can output 4GW at max and wind is operating at 1%CF due to weather, you are screwed unless you ration or import
26.08.2025 13:06 β π 0 π 0 π¬ 1 π 0
Sweden still doesn't have alternative clean firm power. Hydro can be boosted but nordics in general don't want to extend it too much due to environmental concerns. If peak demand grows and wind isn't blowing, telling people to wait isn't an option. Better start building now than waiting
26.08.2025 11:38 β π 0 π 0 π¬ 1 π 0
Low-carbon technologies need far less mining than fossil fuels
Mining for coal is much more resource-intensive than renewables or nuclear power.
Yes if EU wants to ditch gas for firming.
Yes if countries want less transmission expansion
Yes if countries care about material/mining amount ourworldindata.org/low-carbon-t...
Or environmental impact unece.org/sites/defaul...
26.08.2025 10:20 β π 0 π 0 π¬ 0 π 0
Recycling is sadly banned in US under any form
26.08.2025 06:35 β π 0 π 0 π¬ 0 π 0
10% of french power is from recycled MOX from Orano la Hague. They also tested REPU last year
Heck, France even had a reactor designed to work on nuclear waste called Superphenix which was closed under greens pressure. Because of that nowadays only Russia has a big working fast reactor
26.08.2025 06:34 β π 0 π 0 π¬ 1 π 0
Not in France. It actually proved to be the best one
26.08.2025 06:28 β π 0 π 0 π¬ 0 π 0
That's a different thing. Twh will not change much if peak demand grows by some hours but you still need to cover it
26.08.2025 05:02 β π 0 π 0 π¬ 1 π 0
300gw is unrealistic imo
Solar is nice and should be added too, but isn't firm. There's a reason big tech hopes nuclear works- buying carbon credits like before becomes challenging since amount of firm power is limited
26.08.2025 04:55 β π 1 π 0 π¬ 1 π 0
But it exemplifies what you can do in a series build- you start a new unit 1y after prev one and continue this till you are done. But this requires tons of effort and maybe govt intervention similar to messmer
25.08.2025 20:28 β π 1 π 0 π¬ 1 π 0
They had about 8y per units, 12 total. Each unit 1400MW. That's not fast compared to chinese deployments, french messmer ones and even more so-japanese abwr
25.08.2025 20:26 β π 0 π 0 π¬ 1 π 0
But in their case it took bit longer per unit
25.08.2025 20:02 β π 0 π 0 π¬ 1 π 0
You can have one team and move subteams on different sites once their phase is done. That's how you do series deployment. If you want 10 units, 5y each, with team movement, you get 15y total.
Kinda similar to how Barakah was built
25.08.2025 20:02 β π 0 π 0 π¬ 1 π 0
I think this shrimp is from Indonesia
25.08.2025 19:55 β π 0 π 0 π¬ 0 π 0
Utah should better talk to Hitachi
25.08.2025 19:18 β π 1 π 0 π¬ 0 π 0
It was figured out with AbWR. The question is why Vogtle picked AP1000 foak instead of ABWR noak that was a proved design
25.08.2025 19:17 β π 0 π 0 π¬ 1 π 0
It is. Fk wastewater has tritium at levels below WHO limit.
We can speculate, but CS137 is usually used for food decontamination among other usecases like medical sector. My bet is either on that or nuclear weapons testing era
25.08.2025 19:14 β π 1 π 0 π¬ 1 π 0
Basically they installed a new equipment that performed so well that after tests they found out other equipment must be replaced too to work in sync
25.08.2025 15:47 β π 0 π 0 π¬ 0 π 0
You should ask the same question about forever toxic chemicals, some coming from renewables, that must be stored forever. The same solution applies for nuclear
25.08.2025 15:36 β π 2 π 0 π¬ 0 π 0
If peak demand rises ren alone will not be enough and gas will be expanded.
25.08.2025 06:42 β π 0 π 0 π¬ 0 π 0
Writing The Pragmatic Engineer (@pragmaticengineer.com), the #1 technology newsletter on Substack. Author of The Software Engineer's Guidebook (engguidebook.com). Formerly at Uber, Skype, Skyscanner. More at pragmaticengineer.com
Award-winning science educator. Nuclear comms expert. BASILISK Head of education and outreach.
CFF Dogs of Chernobyl charity ambassador.
βA legend.β - Post Malone.
youtube.com/@kylehill
Inventor of things.
Previously: cofounder Beeper.com, partner @ycombinator, founder @pebble
Ideal city: βοΈ nuclear-powered, ποΈ dense housing, π° affordable, π transit. Aka Chicago.
Posting about those things here, and trying to make them better IRL.
Nuclear Reactor Phycisist in the making
Part-time Power Market Analyst at Danish TSO Energinet
Chief of Analysis at Danish Pro-Nuclear Organisation (atomkraft ja tak)
cyklist, student och liberal - beskatta mark - bygg kΓ€rnkraft - reformera kommunlagen
Founder and Executive Director Breakthrough Institute. www.thebreakthrough.org. An original ecomodernist.
Founder of Nuclear Power Yes Please, Denmark π©π° | Working at KΓ€rnfull | Writing about energy and climate βοΈ
Global advisor on better cities, city planning, transportation & urban change. City planner + urbanist leading @ToderianUW.bsky.social. Past Chief Planner for Vancouver BC. Past/founding President of @CanUrbanism.bsky.social. International speaker & media.
Director, Climate and Energy at the Breakthrough Institute. ηζηΆ. He/him. Oceanographer turned solution seeker. Ecomodernism is the way. PhD in Earth and Ocean Sciences.
husband, dad, focused on elevating American entrepreneurs and innovators to achieve energy abundance by deploying at scale. It's simple, not easy. https://www.linkedin.com/in/jigarshahdc/
Nuclear professional, Licensed Control Room Shift Supervisor (SRO). Operations lead for station projects. All views are my own. RT not endorsement.
Video editor. Programmer. Had a strong dislike of creamed corn long before even watching Twin Peaks. Supporter of nuclear power, both boring and not.
Interests and hobbies : πͺπΊEuropean politics, tech, β‘οΈenergy, βοΈNuclear (fission & fusion), π rugby
Energy, carbon tech strategist, analyst, ideation, systems; regulation, policy, economics, investment, conservative gov transitions; energy equity solutions; nuclear, data centers; consultant, baseball coach, live my values, family.
Cofounder of Mothers for Nuclear, procedure writer and former reactor operator at Diablo Canyon Nuclear Plant, balancing advocacy for humans and our planet