Will this be recorded?
04.02.2025 02:16 β π 0 π 0 π¬ 0 π 0@locksmith.bsky.social
Urban Planner (derogatory) | Melbourne
Will this be recorded?
04.02.2025 02:16 β π 0 π 0 π¬ 0 π 0Whereabouts is the new one?
26.01.2025 01:39 β π 0 π 0 π¬ 1 π 0I feel like Iβve just seen a ghost
24.01.2025 02:15 β π 3 π 0 π¬ 0 π 0I support this because it would make the worst people mad
16.01.2025 09:26 β π 1 π 0 π¬ 0 π 0I know this genre of post is overdone but - half hourly trains while the sun is still up really throws me every summer.
21.12.2024 08:34 β π 0 π 0 π¬ 0 π 0All very confusing as LXRP were saying that that was prohibitively expensive due to a large water main near the surface. Council took over delivery and managed it in the same funding envelope apparently, so who knows.
20.12.2024 11:03 β π 0 π 0 π¬ 0 π 0Secret third option where they moved the kerb and kept both the trees and the car parks
20.12.2024 11:01 β π 0 π 0 π¬ 1 π 0Oh yeah, the money and impetus for this came from the Glen Huntly level crossing removal.
20.12.2024 05:36 β π 3 π 0 π¬ 2 π 0Little hard to see, but this is the intersection at Neerim Road at the south end.
Perfectly safe, but kind of inconvenient because you have to cross two legs of the intersection.
Overall, Iβm glad this got built. There was a very real chance the entire thing would have been canned after the earlier controversy. This was the only major piece of bike infrastructure built in Glen Eira by the last council β hoping for more in the next few years. /end
20.12.2024 04:03 β π 6 π 0 π¬ 2 π 0The bike path ends and becomes an on road lane at the north end of Queens Avenue at the intersection with Normanby Road. The image is annotated to show Caulfield Station is to the left, a short way down Normanby Road, and the Djerring Trail begins a short way north of the image. There is no safe bike connection to either.
Travelling south, to transition onto the bike path a rider has to stop in the on road bike lane on the left side of the road and cross the right. People on bikes are required to give way to cars.
Bad stuff β the path abruptly ends just short of Caulfield Station, the Monash Uni campus and the beginning of to the Djerring Trail. Weβre told another project is in the works to fix this, but who knows when that will happen. 6/
20.12.2024 04:03 β π 4 π 0 π¬ 2 π 0A crossover allows access to the bike path at the intersection with Lord Street
Good stuff βThe wide bi-directional path is quite comfortable. Crossovers at every side street means people can easily access the path (something that tends to get forgotten on similar paths elsewhere). 5 /
20.12.2024 04:03 β π 3 π 0 π¬ 1 π 0An annotated map showing that the new path connects the existing Frankston Line bike path in the south and Djerring Trail in the north.
Queens Avenue is an important link between Glen Huntly and Caulfield β the new path almost (foreshadowing) connects existing paths along the Dandenong and Frankston rail lines 4/
20.12.2024 04:03 β π 3 π 0 π¬ 1 π 0Looking north along the Queens Avenue bike path. A street sign to the left of the path shows a 50kph speed limit, with a 'new limit' and a 'bikes only' sign below.
But after much delay and consultation, the whole 800m path was constructed in about a month! Really shows you how quickly things can move once a decision is made. Speed limit has also dropped from 60 to 50 to accommodate narrower traffic lanes 3/
20.12.2024 04:03 β π 6 π 0 π¬ 2 π 0The original proposal would have resulted in the loss of a couple of hundred trees (bad), and the alternative would have removed all on street parking (fine with me, but you can imagine how that went down) www.theage.com.au/national/vic... 2/
20.12.2024 04:03 β π 2 π 0 π¬ 1 π 0Looking north along Queens Avenue, Caulfield, from the intersection with Neerim Road. The new bi-directional bike path follows the road on the left hand side.
Went to visit the newly opened Queens Avenue bike path in Caulfield today, just under a year since @highcapacityhayden.bsky.social and I sat down at a community meeting for the first time. 1/
20.12.2024 04:03 β π 12 π 1 π¬ 1 π 0The VicRoads office where I did my driving test was right on this intersection youtu.be/h1Uxq3thyAU?...
19.12.2024 07:28 β π 2 π 0 π¬ 1 π 0Stuff like this is just the result of two different project managers yelling βout of scopeβ at each other over a 10 email long thread
18.12.2024 10:10 β π 2 π 0 π¬ 0 π 02020 still seems to be the most recent release. I suspect someone realised they werenβt going to meet theyβre own deadlineβ¦
11.12.2024 20:15 β π 0 π 0 π¬ 1 π 0Oh good, more βmarket led proposalsβ. The last one has been going so well.
11.12.2024 06:48 β π 1 π 0 π¬ 0 π 0Does anyone have any insight into when theyβll release the next round of VISTA data?
Iβm pretty sure the website used to say βlate 2024β but this seems to have disappeared recently.
I believe itβs because Clayton has the relatively arbitrary βpremiumβ designation
08.12.2024 05:15 β π 1 π 0 π¬ 0 π 0The Chadstone bus situation is such a debacle, especially on weekends.
30.11.2024 02:21 β π 3 π 0 π¬ 0 π 0Misleading map stating that βup to 20 storiesβ is proposed 800m from Carnegie, Murrumbeena, Hughesdale and Oakleigh railway stations.
Featuring such absurdity and fear mongering as suggesting that a blanket 20 storey height limit is proposed for every activity centre
27.11.2024 08:05 β π 3 π 0 π¬ 0 π 0Letter from David Davis MP hyperbolically lamenting Laborβs proposed activity centre and housing plan in the south east of Melbourne.
Pleased to be the recipient of the David Davis NIMBY Newsletter
27.11.2024 08:05 β π 3 π 0 π¬ 1 π 0Difficult to understand what exactly has occurred from the article, but sounds like the Council doesnβt want to cover the cost of traffic management (including existing conditions studies) for what is ostensibly a private event.
And the organisers donβt want to cover that either.
To be fair, these events attract hundreds of cars to local streets which are not designed to carry the traffic or parking. Some kind of management will be necessary
The actual solution is to just close the entire block to non-resident traffic (but I doubt Bayside would support that either).
Like 3/4 of these clips should result in an instant loss of licence.
24.11.2024 23:10 β π 1 π 0 π¬ 0 π 0I think, for me, something that has radicalised me the most against car culture is the fact that this channel has enough material to put out a video every week
youtu.be/6prQb6nSRvw?...
Murrumbeena Rd is a mess on weekends in particular. Would love to see a boosted 627/822, but also needs some strategic intersection treatments to keep them moving.
24.11.2024 09:04 β π 3 π 0 π¬ 1 π 0