renomate.bsky.social's Avatar

renomate.bsky.social

@renomate.bsky.social

19 Followers  |  40 Following  |  10 Posts  |  Joined: 19.10.2023  |  1.5942

Latest posts by renomate.bsky.social on Bluesky

Unfortunately Colwood did not install bike specific lights at this intersection. you just go on the pedestrian signal, there is also a countdown timer.
All motor traffic must stop when goose traffic gets a crossing light, motor traffic gets a red light in all directions.

07.05.2025 13:41 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

yes, the lights specifically for bikes are the same as regular lights, in that you stop on red, go on green etc.

07.05.2025 13:40 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

Sure enough as soon as the cyclist waiting at the light ahead of me got the "walk" symbol to cross, the driver cut in front of me, on a red light. you can hear me brake and I swerve left to miss him. I'm sure he had no idea I was even there...
anyways that's it!

07.05.2025 04:41 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

A guy on a bike had already hit the button to cross, and as I approached I saw a car had stopped on his red light, I felt like he was going to cut me off, so as I'm approaching I get my phone out of my handlebar bag, turn on the camera, switch to video mode and start recording....

07.05.2025 04:41 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

After many months they finally made it "no right turn on red" so that drivers don't cut people off using the goose.
well I see plenty of drivers still running the red light, I had that feeling as I approached the intersection.

07.05.2025 04:41 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0
Video thumbnail

you know when you get the feeling that a driver is going to cut you off, even well before it happens?
well that happened to me on the way home.
I'm not sure if you've ridden through the new goose crossing of Wale Rd in Colwood since it's been improved.

07.05.2025 04:41 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

The tender has been awarded.
I have seen the preliminary geotechnical drilling and coring take place.
I understand that it needs to be completed before the end of 2026, in order to receive the grant funding for the project.
It's going to be 4 metres wide. (same as the switch bridge)
That's about it.

24.02.2025 21:12 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0

I walked home with my daughter from school, took around 25mins, her friends took the school bus... 90minutes!

04.02.2025 17:27 β€” πŸ‘ 1    πŸ” 0    πŸ’¬ 0    πŸ“Œ 0
Post image Post image Post image

I did a combination of bus, car pool and lots of walking...
my son rode with one of his mates πŸ˜ƒ

04.02.2025 17:25 β€” πŸ‘ 0    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0
Post image Post image

@erikwdv.bsky.social Always excited to see businesses open close to my home.
Picked the family up some Colwood Pizza Co tonight.
2 minutes from my house...

25.01.2025 04:47 β€” πŸ‘ 6    πŸ” 0    πŸ’¬ 1    πŸ“Œ 0

@renomate is following 20 prominent accounts